Toll Free: +1 (800) 523-7867
|

Stop It® HP™

Case Study

A high pressure 4″ fiberglass pipeline was damaged by a motorized grader during an unauthorized excavation

“In the inhospitable desert of Dakar, Africa a high pressure 4″ fiberglass pipeline was damaged by a motorized grader during an unauthorized excavation…”

  • Product
    Stop It® HP™
  • Industry
    Refinery/Petrochemical
  • Location
    Dakar, Africa
  • Application Time
    2 Hours
error: Content is protected !!