Stop It®

Project Details

“The aim of this project was to conduct a thorough evaluation of repair methods for leaks of above-ground piping in an effort to establish permanency of repairs. Based on an in-depth review of current repair systems for above ground leaks three manufacturers and four repair products were chosen…”

Click here to download

  • Product Stop It®
  • Industry Refinery/Petrochemical
  • Location Ocean
  • Application Time 2 Hours