Stop It® Pipe Repair System

Project Details

“On October 9, 2001, during excavation of soil for the 30- in. TRA-605 Warm Waste Pipeline Replacement Project, a radiological control technician detected contamination in a backhoe bucket load of removed soil…”

Click here to download

  • Product Stop It® Pipe Repair System
  • Industry Construction
  • Location Idaho
  • Application Time 2 Hours